Kitchen Remodel Costs & Rules in Australia (2025)

Quick Answer: A kitchen remodel in Australia typically costs $15,000–$50,000+ in 2025, depending on size, layout changes and finishes. Expect 2–8 weeks on site plus lead times for cabinetry and benchtops. Structural changes and all electrical, plumbing and gas work require licensed trades, and rangehoods should duct to outside under the NCC.
Thinking about a Kitchen Remodel? In Australia, the right planning saves money, avoids approval headaches and keeps you safe. This guide covers 2025 costs in AUD, timelines, compliance (NCC/BCA, state licensing), energy and water efficiency, material choices, and a practical step-by-step so you can brief designers and trades with confidence.
Table of Contents
- Kitchen Remodel Overview
- Benefits & Drawbacks
- Costs in Australia (2025)
- Timeline (Planning → Handover)
- Approvals & Permits
- Safety & Compliance
- Energy & Water Efficiency
- Materials & Finishes
- Design Tips
- DIY vs Professional
- Common Mistakes
- Maintenance
- State Notes (QLD, NSW, VIC)
- Step-by-Step Plan
- Checklist
- FAQs
1. Kitchen Remodel Overview
A kitchen remodel ranges from a cosmetic refresh (paint, tapware, handles) to a gut-and-replace with new layout, services and appliances. Budget is shaped by scope (like-for-like vs moving plumbing), materials (laminate vs natural stone), appliances, and labour rates. Expect licensed trades for electrical, plumbing and gas in every state.
2. Benefits & Drawbacks
Benefits
- Better workflow, storage and safety
- Higher buyer appeal and energy/water savings with efficient appliances and fittings
- Improved functionality and modern aesthetics
- Increased property value
Drawbacks
- Disruption (2–8+ weeks) and lead times for cabinetry/benchtops
- Compliance steps (ventilation, strata approvals) add admin and cost
- Potential for unexpected costs during demolition
- Need for temporary kitchen setup during renovation
3. Kitchen Remodel Costs in Australia (2025)
Typical totals (materials + labour):
- Budget/small: $15,000–$30,000
- Mid-range: $25,000–$45,000
- Premium/large: $45,000–$80,000+
Recent AU guides and builder data place the average around the mid-30s, with wide variation by city and scope.
Labour Rates (Guide)
- Electrician: ~$80–$100/hr (+ call-out)
- Plumber: ~$80–$200/hr (+ call-out)
- Tiler: ~$45–$150/m² (labour)
Tier | Typical Inclusions | Estimated Total (AUD) |
---|---|---|
Budget | Keep layout, flatpack cabinets, laminate tops, entry appliances | $15k–$30k |
Mid-range | Partial re-layout, custom/rigid cabinets, stone alternatives, mid-high appliances | $25k–$45k |
Premium | Full re-layout, bespoke joinery, premium benchtops/splashbacks, integrated appliances | $45k–$80k+ |
Important: Since 1 July 2024, engineered/quartz stone is nationally banned due to silica risks—plan alternatives (porcelain/sintered, natural stone, laminate, stainless, timber, solid surface).
4. Typical Timeline
Phase | What Happens | Typical Duration |
---|---|---|
Design & Quoting | Measure, layout options, compliance check | 1–3 weeks |
Ordering & Lead Times | Cabinets, appliances, benchtops | 2–6+ weeks |
Site Start & Demolition | Strip-out, protection, waste | 1–3 days |
Rough-in | Electrical, plumbing, gas | 2–5 days |
Cabinets Install | Carcasses, doors, hardware | 3–7 days |
Benchtop Template → Install | Template after cabinets; manufacture; fit | 7–21 days from template |
Appliances, Splashback, Flooring | Install & commission | 2–5 days |
Finishing & Handover | Caulking, adjustments, compliance docs | 1–3 days |
5. Approvals & Permits (What to Check)
NCC/BCA Ventilation
Rangehoods should exhaust to outside; avoid recirculating setups where direct discharge is required.
Building Approval
Many internal renovations need building approval if structural (e.g., removing load-bearing walls). Private certifiers issue approvals; minor internal like-for-like may not require planning approvals—check your project.
Strata/Body-Corp
Apartments/townhouses often need written approval for works affecting common property, services or external appearance. NSW classifies strata works as cosmetic/minor/major with different approvals.
Tip: If you're uncertain, call your council/certifier with a sketch and scope. Keep approvals in your handover file.
6. Safety & Compliance (Don't Skip)
Licensed Trades
- Electrical: You must use a licensed electrician. DIY wiring is illegal and unsafe.
- Plumbing & Gas: Only licensed practitioners may alter water/waste and gas.
Asbestos
About 1 in 3 Australian homes (pre-1990) still contain asbestos; disturbing it during demo is dangerous—engage licensed assessors/removers.
Lead Paint
Pre-1970 paints may contain lead; use safe methods (wet sanding, containment) and follow health guidance.
Gas Cooktop Clearances
New AS/NZS 5601.1:2022 increases minimum overhead clearance to 650 mm for rangehoods (and 750 mm for exhaust fans) unless manufacturer specifies otherwise.
7. Energy & Water Efficiency (and Indoor Air)
Energy Rating Label
Choose higher-star fridges, dishwashers, ovens—use the government database/calculator to compare running costs.
WELS Water Rating
Select high-star taps/dishwashers (mandatory national scheme).
Induction vs Gas
Induction is efficient and reduces indoor NO₂ compared with unflued gas; NSW Health highlights indoor air concerns from gas.
Ventilation
NCC guidance expects kitchen exhaust to the outside; recirculating hoods are poor at removing moisture/NO₂/grease.
8. Materials & Finishes (What to Pick in 2025)
Benchtops (Engineered Stone Ban Applies)
- Porcelain/sintered stone: Heat/UV-resistant, thin profiles; mid-to-high cost
- Natural stone (granite/marble): Premium look; seal periodically
- Solid surface (acrylic): Seamless joins; repairable; moderate heat care
- Laminate: Budget-friendly; modern textures; best value
- Stainless steel/timber: Niche looks; consider denting (SS) and sealing (timber)
Cabinetry
Flatpack/rigid modules save time; bespoke joinery offers exact fit. Example lineal-metre pricing shows large variation by style (laminate vs Shaker).
Splashbacks
Tiled, porcelain slab, glass, stainless. Check gas clearances to combustibles and suitable materials behind burners.
9. Design Tips (AU-Practical)
- Layout: Prioritise clear zones (prep, cook, clean) and 900–1,000 mm walkways
- Storage: Deep drawers over doors; pull-outs in corners; bin near sink/dishwasher
- Lighting: Layers—task (under-cabinet), ambient (ceiling), accent (pendants)
- Power & Data: Enough GPOs on dedicated circuits; USB-C in a charging nook
- Ventilation: Specify a ducted rangehood sized to cooktop width or larger; terminate externally with proper flashing
10. DIY vs Professional
DIY Okay For:
- Painting
- Handles
- Flatpack assembly (if comfortable)
Professional Only For:
- Electrical work
- Plumbing
- Gas fitting
- Waterproofing where required
- Any structural work/beam design
Fines and safety risks aren't worth it.
11. Common Mistakes
- Recirculating rangehoods (grease/odour linger)
- Not checking strata and building approvals up front
- Ordering appliances after cabinetry is built (fit issues)
- Ignoring clearances around gas cooktops
- No plan for asbestos/lead in older homes
12. Maintenance (Make it Last)
- Seal natural stone/timber as recommended; use cutting boards and trivets
- Clean rangehood filters monthly; replace carbon filters if any recirc modes
- Check silicone joints annually; re-caulk if moulded or cracked
- Keep WELS aerators clean to maintain flow and efficiency
13. State Notes (Quick Highlights)
QLD
Building approvals commonly handled by private certifiers; most electrical work requires licensed electricians; gasfitting requires the relevant licence. Strata/Body-corp improvements to common property need approval.
NSW
Electrical and plumbing/gas work require licences; strata classifies works (cosmetic/minor/major) with different approval paths.
VIC
Plumbing is regulated by the VBA; check Energy Safe Victoria guidance for gas clearances.
14. Step-by-Step Plan
- Measure & Brief: Room sizes, windows/doors, services
- Scope & Budget: Decide like-for-like vs re-layout; shortlist finishes
- Compliance Check: Ventilation route, gas/electrical/plumbing, strata/council
- Design & Quotes: Get 2–3 quotes for cabinetry, benchtops, trades
- Order Long-Lead Items: Cabinets, benchtops, appliances
- Protect & Demolish: Dust control; asbestos/lead checks if pre-1990/1970
- Rough-in: Licensed electrician, plumber, gasfitter
- Install Cabinets → Template Tops: Keep levels true; confirm scribe lines
- Fit Benchtops & Splashback: Set appliances; duct hood outside
- Test & Handover: Compliance/CoC paperwork, manuals, care sheet
15. Checklist (Before / During / After)
Before
- ☐ Confirm approvals (strata/certifier) and ventilation route
- ☐ Lock materials compatible with gas clearances if relevant
- ☐ Book licensed electrician, plumber, gasfitter
- ☐ Order WELS/energy-rated fixtures/appliances
During
- ☐ Protect adjacent areas; manage waste responsibly
- ☐ Rough-in tested; photos behind walls (future reference)
- ☐ Rangehood duct installed to outside (no recirc)
- ☐ Benchtop templates signed off
After
- ☐ Electrical/Plumbing/Gas compliance docs on file
- ☐ Filter maintenance schedule set
- ☐ Warranty/receipt folder created
16. FAQs
What is the average cost of a kitchen remodel in Australia?
Most projects fall between $15k and $50k+; averages in the mid-$30k are common, with metro locations and layout changes pushing higher.
How long does a remodel take?
On-site works are often 2–8 weeks, plus ordering time for cabinets and benchtops.
Do I need council approval?
If you're removing structural elements or altering building fabric, expect a building approval. Like-for-like internal swaps may not need planning approval; check with a private certifier/council.
Is engineered stone still allowed?
No—engineered stone (quartz) is banned nationally from 1 July 2024 due to silica risks. Consider porcelain/sintered, natural stone, solid surface, laminate, stainless or timber.
Can I DIY electrical or plumbing?
No. Licensed trades must do electrical, plumbing and gas.
What rangehood is compliant?
Choose a model you can duct to outside; NCC guidance expects direct exhaust, and gas cooktops have specific clearances (often 650 mm to a rangehood).
How do I choose efficient products?
Use the Energy Rating and WELS labels/databases to compare energy and water use across models.
I'm in a strata unit—what approvals do I need?
NSW categorises renovations as cosmetic/minor/major with different approvals; always check by-laws and obtain written consent before starting.
Ready to Start Your Kitchen Remodel?
Book a design consult, request three quotes from licensed trades, or try a cost calculator using the ranges above to set a realistic budget.
Start Your Free RenovationTL;DR
- Cost: ~$15k–$50k+; average mid-$30k in 2025
- Time: ~2–8 weeks on site + lead times
- Rules: Licensed electrician/plumber/gas, duct rangehood outside, mind asbestos/lead
- Materials: No engineered stone—choose porcelain/sintered, natural stone, laminate, etc.
- Efficiency: Use Energy Rating and WELS labels; consider induction